Fort Bragg Transient Students Barracks - Innovative Engineering Incorporated

Fort Bragg Transient Students Barracks - Innovative Engineering Incorporated

Fort Bragg, NC

35% design of 70,000 SF, LEED-Certified barracks for 180 students. Structure consisted of metal roof deck on light gauge roof trusses on load bearing light gauge walls and concrete floor slabs on composite metal deck. Conventional spread foundations and retaining walls were used on this project. The $21.2M structure was designed for ATFP requirements including progressive collapse.

Innovative Engineering Inc provided 35% structural design and blast engineering for a design-build request for proposal (RFP) for the fourth building of the Transient Student Barracks (70,000 sq ft) at Ft. Bragg, NC. The structure consisted of metal roof deck on light gauge roof trusses on load bearing light gauge walls and concrete floor slabs on composite metal deck. Conventional spread foundations and retaining walls were used on this project. The structure was designed for Anti-Terrorism Force Protection (ATFP) including progressive collapse blast requirements.

This forth quad barracks consisted of a five (5) story 70,000 SF building that was to provide housing for approx. 180 students. The project was to be designed and built to achieve LEED Silver Certification. The estimated construction cost was valued at $21M.

Our Clients Include:

Air Tran
Anheuser-Busch
Caterpillar
CDC
Chevron
Chipotle
Clorox
Coca-Cola
Delta Airlines
Department of Defense
Emory
FBI
Fiat Industrial
General Motors
Georgia Tech
Hardees
KFC
Lilly
Marriot
Navy
Panda Express
Travelcenters of America
University of Georgia
United States Marine Corps
usace
USAF
USDA
USPS
Department of Verterans Affairs
GSA
GA Tech
AT&T
CBRE Group
Cushman & Wakefield
JLL
Colliers
Transwestern
Novelis
Jervis B Webb